BEYOND BATTERIES

Every battery pack we manufacture is controlled by our proprietary BMS, developed in-house, matched to our own cells, and engineered to manage performance across the full system lifetime.

Active materials are assembled piece by piece on highly-automated production lines, with process control at the cell level.

We count time in megawatt-hours. 2,300 MWh of annual production capacity, running 365 days a year. Output has grown 10x in the past three years, driven by our own manufacturing chain, on our own terms.

Our supply chain is European by design. The same discipline that runs our production floor carries through to every project we deliver, across 70+ countries.

Prime Batteries factory

Growth Journey

Energy infrastructure background

2025

  • Preparing for scale-up to over 8.3 GWh capacity
  • T2Y Capital becomes shareholder
  • Enhancing our Battery-as-a-Service offering
  • 2.3 GWh factory completed and operational

2024

  • Top Material Co., Ltd. becomes shareholder
  • Delivered projects in Germany, Poland, Norway, Spain & Italy
  • Expanded into mobility, grid, and industrial applications

2023

  • 2 GWh factory under construction
  • EIT InnoEnergy makes additional investment
  • Entering new markets

2022

  • Positioned to become Europe's leading BESS manufacturer
  • Ordered manufacturing equipment for new Gigafactory
  • EIT InnoEnergy becomes shareholder

2021

  • EV traction battery agreement for truck manufacturer
  • 96 MWh Grid System BESS agreement secured

2020

  • Commissioned the first cell production line in SE Europe
  • 12V battery qualification achieved for automotive application

2019

  • First supply agreement for electric buses
  • Started supplying batteries across the EU

2018

  • Secured the first supply contract for electric vehicles
  • Launched ESS for stationary applications

2017

  • Certified the first EV for public road transportation
  • Developed the first BMS

2016

  • Company incorporation
  • Established the initial R&D team
  • Launched the first products on the market

BUILT ON MORE THAN BATTERIES

Making a battery system that performs over time starts with decisions made long before it leaves the factory. Who manufactures the cells. How the production chain is controlled. Whether the solution is matched to the application. And the commitment to stay involved when it matters most. These are the four pillars Prime is built on.

01

In-House Engineering

Every Prime system is built within one production chain, from electrode to final pack assembly. That's what keeps quality consistent, regardless of project scale.

02

Flexible Solutions

One battery does not fit all. Prime delivers adaptive chemistry, modular sizing, and proven manufacturing across a range of business models and applications. Each solution is engineered to the requirements of its end use.

03

Vertical Integration

Prime manufactures its own Li-ion cells from scratch. Every stage of production happens within a single facility, ensuring consistent quality, full traceability, and a system built to perform exactly as engineered.

04

Long-Term Partnership

A battery system operates long after commissioning day. Prime stays involved, through monitoring, maintenance, and performance optimization, because the real measure of the work is how it runs over time.

The Long View

How we build matters just as much as what we build. The same principles that go into every system apply to every stage of the production process.

Join our team

JOIN OUR VISION

Let's build what powers the future.

>100

Battery technology experts

10 years

Of R&D and manufacturing

#1

Cell-to-system BESS manufacturer in the EU

Prime Batteries team