5 FT with EV Charger
Full Performance with Integrated EV Charging
315 kWh of movable storage with DC fast charging up to 150 kW and AC charging up to 22 kW — built into the same 4.2-tonne enclosure. Buffer local EV demand without grid reinforcement, powered by integrated PCS, BMS, EMS and fire suppression.
Inquiry
Available Configurations

Standard

With EV Charger
Integrated EV Charging
DC fast charging up to 150 kW and AC charging up to 22 kW — no separate charging infrastructure required.
Proven & Reliable
Li-ion cells with integrated fire suppression. Engineered for extreme weather operation.
Vertically Integrated
European manufacturing from cells to deployment. Proprietary BMS with predictive maintenance algorithms.
Turnkey & Movable
Plug-and-play installation. Forklift-compatible — reposition or redeploy as project requirements shift.
Applications
EV Charging Hubs
Battery buffering delivers high-power DC fast charging on sites with limited grid capacity.
Fleet Depots
Smooth peak loads during overnight or back-to-back vehicle charging cycles.
Renewable Integration
Store solar or wind generation on-site and dispatch to vehicles on demand.
Backup Power
Emergency power supply for critical infrastructure during grid outages.
Configurations
Available Configurations
PB-HD-140-315-C
Movable BESS + EV Charging
Installed Capacity
Max Power
PB-HD-160-315-C
Heavy Duty BESS + EV Charging
Installed Capacity
Max Power
Strategic Advantages
Why European utilities, IPPs and industrials choose Prime.
Complete Integration
Single-source responsibility from cells to commissioning.
European Supply Chain
Every component — from cell to system — is sourced and manufactured within Europe, ensuring quality, traceability, and supply chain resilience.
Rapid Deployment
Plug-and-play installation with accelerated project timelines.
Local Support
European engineering team and service network. Predictive maintenance via proprietary BMS.
Charge without grid upgrades.
The integrated EV variant packs DC fast charging and AC charging into the same movable 5 ft enclosure, letting you deploy fast charging on sites where a grid upgrade would be impractical or slow. Buffer from the battery, dispatch to vehicles on demand.
Request Custom QuoteDC Fast Charging
Up to 150 kW DC fast charging directly from the battery — no dependence on grid capacity at peak demand.
AC Charging
Integrated AC charging up to 22 kW for destination or overnight use cases.
Heavy Duty Option
Upgrade from 140 kW to 160 kW output — same enclosure, higher grid capacity.
Relocatable
Forklift-compatible at 4.2 t. Reposition between sites or redeploy when projects evolve.
All configurations are built on Prime's proprietary cell-to-system platform, manufactured entirely within Europe.